MIPI Sensor Integration Checklist

· Endoscope Mainboard

MIPI Sensor Integration Checklist

lane、Clock, reset and power time sequences do not step on the pit.。

Background and objectives

lane、Clocks, double-digits and electrical time series do not step on the pit. The combination of industry, medical and pet inspection differences in the field of Produc describes key decision points on interfaces, drawings, delays and mass production of the control panels。

Key Points for Implementation

Joint InvestigationIt is recommended that the probe, light source and display of the itemms be fixed and that only one parameter be changed at a time; the background and version numbers be retained to facilitate medical changes to the Controlling or industrial acceptance handover。

Acceptance Recommendations

The indicators are included in the project checklist and archived with mirrors, calibration parameters. 18616597379。

Need assistance in selecting?

Description of scene and interface, Endoscope Mainboard can help the platform match the Joint Investment Project。

← Back to News List